The gateway to Europe's
integrated metrology community.

The list shows all projects coordinated within the Technical Committee for Flow.

TC Flow Projects

Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
F 1008 2007-07-20 Key Comparison: Volume Inter-comparison at 20 L - EURAMET Regional Key-comparison of CCM.FF-K4 IPQ completed Comparison EURAMET.M.FF-K4.b
F 1007 2007-04-10 Bilateral comparison of the turbine gas meter in flow rates from 80 m3/h to 1600 m3/h UME completed Comparison
F 1006 2008-04-01 Inter-laboratory calibration comparison of the turbine gas meter in flow rates from 1000 m3/h to 10000 m3/h CMI completed Comparison
F 1004 2007-07-20 Bilateral comparison of a 500 µl micropipette IPQ completed Comparison
F 877 2006-01-01 Intercomparison on Water/Heat meters at 50 °C, 6-25 l/h RISE completed Comparison
F 865 2006-01-01 Volume calibration of 1000 µl micropipettes IPQ completed Comparison
F 863 2005-08-01 Inter-comparison on Water/heat meters at 50 °C for 50mm pipe RISE completed Comparison
F 862 2006-03-27 Inter-laboratory calibration comparison of the turbine gas meter G650 CMI completed Comparison
F 854 2003-07-01 Installation effects with decrease the accuracy of water measurements BEV completed Research
F 852 2005-07-01 Supplementary Comparison: Bell-, Piston-Prover Bilateral-Comparison METAS completed Comparison EUROMET.M.FF-S1
F 831 2004-01-01 Intercomparison of calibration of master meters installed in a test rig, by two independent test methods (standard capacity tanks and Brooks piston prover) BEV completed Comparison
F 827 2005-09-01 Supplementary Comparison: LDA-based intercomparison of anemometers PTB completed Comparison EUROMET.M.FF-S5
F 821 2004-11-01 Bilateral comparison of the test rigs of BEV and JP Energetika Ljubljana (representative laboratory for water flow measurements in Slovenia) BEV completed Comparison
F 806 Supplementary Comparison: Intercomparison of low pressure gas flow facilities using a Molbloc transfer package NEL completed Comparison EUROMET.M.FF-S3
F 800 2004-09-01 The Harmonization of Reference Values for High-Pressure Natural Gas Volume VSL completed Research
F 799 2004-07-01 Technical characteristics and calibration capabilities of testing facilities for big water meters in Europe - Establishment of a data base BEV completed Research
F 793 2004-06-01 Bilateral comparison of a 100 ml Gay-Lussac Pycnometer IPQ completed Comparison
F 692 2002-09-01 Key Comparison: Volume calibration of a 100 ml Gay-Lussac Pycnometer IPQ completed Comparison EUROMET.M.FF-K4
F 691 2002-11-01 Calibration inter-comparison of a 5-litre volume glass standard RISE completed Comparison
F 669 2002-07-01 Intercomparison of two electromagnetic meters DN 25 BEV completed Comparison
F 574 2000-01-01 Continuation intercomparisons of water facilities using a 200 mm orifice package NEL completed Comparison
F 573 2000-01-01 Intercomparison of small water flow facilities NEL completed Comparison
F 572 2000-05-01 Hydrocarbon intercomparison of 100 - 150 mm turbine meter calibrations NEL completed Comparison
F 571 2000-04-01 200 mm Water flow intercomparison NEL completed Comparison
F 547 2000-01-01 Measuring systems for milk - calibration with water and milk BEV completed Comparison
F 514 1999-02-01 Supplementary Comparison: Intercomparison of anemometer test facilities using thermal anemometers and mechanical anemometers VSL completed Comparison EUROMET.M.FF-S4
F 491 1998-12-01 Measurement standards for the density for liquids at elevated pressure NEL completed Comparison
F 474 1998-09-01 Intercomparison of high pressure gas flow measurement facilities using turbine and Venturi meters NEL completed Comparison
F 470 1998-06-01 Intercomparison of the C* calculation NEL completed Comparison
F 452 1998-02-01 Comparison on Uncertainty Calculations in Flow Calibration RISE completed Comparison
F 425 1997-09-01 Intercomparison of Bell Provers using a transfer meter NEL completed Comparison
F 419 1997-09-01 Intercomparison of Calibrations of a G250 Rotary Gas Meter FORCE completed Comparison
F 407 1997-03-01 Intercomparison of calibrations of two G 400 turbine meters assembled in series completed Comparison
F 388 1996-09-01 Intercomparison of anemometers METAS completed Comparison
F 307 1994-11-01 Sonic Nozzle intercomparison NEL completed Comparison
F 271 1993-01-01 Flowmeter installation effect in gases PTB completed Research
F 187 1990-01-01 Development of miniaturized optical flowmeters PTB completed Research
137 result(s)