Please type a search term (at least two characters)
EURAMET Project Documents for Download
- EURAMET Guide No. 4: Guide on Comparisons
- Declaration of Coverage of CMCs by QMS (G-OPS-FRM-013)
- Eligibility Criteria for the Participation in EURAMET TC Projects
- EURAMET Guidelines for TC Projects
- Project Form: Registration of Agreed and Starting Projects
- Project Form: Progress and Final Report
- Project Form: Traceability Projects
- Project Form: Participation in EURAMET Comparisons
The list shows all projects coordinated within the Technical Committee for Thermometry.
Projects TC-T
Subject | Reg. No. | Starting | TITLE | Coordinating Institute | Status | Collaboration Type | KCDB |
---|---|---|---|---|---|---|---|
T | 926 | 2006-11-01 | High temperature fixed points for future temperature scale | NPL | completed | Research | |
T | 1065 | 2008-07-01 | Survey & strategic planning in the field of measurement of moisture in materials | NPL | completed | Research | |
T | 1459 | 2018-06-01 | Air Temperature Metrology - ATM | INRIM | in progress | Research | |
T | 1235 | 2012-11-01 | Establishing and checking traceability for radiative properties of materials | LNE | completed | Research | |
T | 1294 | 2013-11-01 | Circulation of Pond Eng. Ar Triple Point System K-38 | VSL | in progress | Research | |
MC, T | 1400 | 2016-04-27 | Moisture metrology development | NPL | ongoing | Research | |
T | 1516 | 2020-12-01 | Determination of thermophysical quantities measurement capabilities beyond EURAMET | SMU | in progress | Research | |
T | 1576 | 2023-02-01 | Air Temperature Calibration System (ATCS) | BEV | in progress | Research | |
T | 1022 | 2007-11-01 | Traceability of dew/frost point temperature | INRIM | completed | Traceabillity | |
T | 151 | 1994-01-01 | Provision of traceability for absolute humidity | NPL | completed | Traceabillity | |
T | 411 | 1996-10-01 | Traceability in infrared radiation thermometry from -50 °C to 800 °C (TRIRAT) | VSL | completed | Traceabillity | |
T | 711 | 2003-03-31 | Traceability in humidity (dew-point temperature) | INTA | completed | Traceabillity | |
T | 713 | 2003-05-01 | Traceability of ITS-90 fixed points | LNE-LCM/CNAM | completed | Traceabillity | |
T | 729 | 2003-06-01 | A mercury point realisation | LNE-LCM/CNAM | completed | Traceabillity | |
T | 869 | 2005-10-12 | Co-operation in humidity between NMISA and MIKES | MIKES | completed | Traceabillity | |
T | 930 | 2007-04-01 | Traceability of sealed fixed point cells (ITS-90) | BEV | completed | Traceabillity | |
T | 1128 | 2007-05-06 | Traceability of SPRTs | MIRS/UL-FE/LMK | completed | Traceabillity |
167 result(s)