The gateway to Europe's
integrated metrology community.
Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
IR 1243 2013-03-01 The interlaboratory comparison of radionuclide calibrators FTMC completed Traceabillity
L 1242 2013-09-01 Measurement of areal roughness parameters PTB in progress Research
T 1241 2012-09-24 Training in temperature and humidity measurements INRiM completed Consultation
M 1240 2012-10-20 Supplementary Comparison: Density determinations of liquid samples by density meters BEV completed Comparison EURAMET.M.D-S1
L 1239 2013-08-01 Measurement of surface roughness by AFM PTB in progress Research
Q 1238 2012-10-01 On-site peer review of quality management system with respect to requirements of ISO Guide 34 UME completed Consultation
L 1237 2012-08-01 Calibration of Short Gauge Blocks by Mechanical Comparison UME completed Consultation
T 1236 2011-05-19 Comparison of the realisations of the ITS-90 over the range of 234.3156 K to 692.677 K MIRS/UL-FE/LMK completed Comparison
T 1235 2012-11-01 Establishing and checking traceability for radiative properties of materials LNE completed Research
T 1234 2012-11-01 Improving traceability in differential scanning calorimetry LNE concluded Comparison
F 1233 2012-08-01 Intercomparison of water flow meter reference standard UME completed Comparison
M 1232 2012-05-07 Bilateral supplementary comparison of calibrations of mass standards MCCAA-SMI completed Comparison EURAMET.M.M-S4
Q 1231 2012-06-01 On-site peer review of EIM QMS UME completed Consultation
EM 1230 2012-06-01 EURAMET Key International Comparison of AC-DC Current Transfer Standards BEV completed Comparison EURAMET.EM-K12
EM 1229 2020-01-01 Supplementary Comparison: Traceability in partial discharge (PD) apparent charge and other parameters MIKES completed Comparison EURAMET.EM-S36
M 1228 2012-07-11 Bilateral supplementary comparison of 20 kg mass standard provided by DMDM DMDM completed Comparison EURAMET.M.M-S6
Q 1227 2012-06-01 Peer review of QMS of LNE-Cnam LNE-LCM/CNAM completed Consultation
PR 1226 2012-09-01 Supplementary comparison of Reference Solar Cells PTB completed Comparison EURAMET.PR-S5
F 1225 2013-01-31 Supplementary Comparison: Intercomparison of very low air speed standard facilities (0.05-1m/s) BEV/E+E completed Comparison EURAMET.M.FF-S9
F 1224 2012-03-23 Comparison VSL - PTB Volume flow for Natural Gas under High Pressure PTB concluded Comparison
1313 result(s)