The gateway to Europe's
integrated metrology community.

9th EURAMET General Assembly and Scientific Symposium

Venue
Holiday Inn Krakow City Centre
Ul Wielopole 4
31-072 Kraków, Polen


Thursday, 4th June 2015
Start: 8h30

Scientific Symposium on 'Metrology meeting the challenges in energy, environment and health'

  • Welcome and introduction
    Beat Jeckelmann, EURAMET
  • Meteorology: Challenges related to remote sensing or traceability of atmospheric measurement quantities (Abstract)
    Prof. Bertrand Calpini, WMO Representative EURAMET Research Council
  • Metrology for a sustainable energy system: research hightlights. impacts and challenges for the future (Abstract)
    Dr Jean-Remy Filtz, LNE (France)
  • EMRP health research: challenges  and achievements (Abstract)
    Helen Parkes, LGC (UK) and Ian Severn, NPL (UK)
  • Metrology in chemistry as a smart specialization of Poland: the collaboration between Główny Urząd Miar and University of Warsaw (Abstract)
    Prof. Ewa Bulska, Biological and Chemical Research Center, University of Warsaw

Group photo EURAMET General Assembly 2015
Time schedule

Event Information

Date
2015-06-01 to 2015-06-05
Location
Krakow, Poland
Categories
EURAMET General Assembly

Documents

Agenda(s)
Document(s)
Minutes