The list shows all projects coordinated within the Technical Committee for Thermometry.

Projects TC-T

Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
T 733 2003-01-30 2nd International Seminar on low temperatur thermometry INTiBS completed Research
T 730 2003-06-01 A comparison of temperature scale near fixed points in the low temperature range. LNE-LCM/CNAM completed Comparison
T 729 2003-06-01 A mercury point realisation LNE-LCM/CNAM completed Traceabillity
T 872 2005-10-15 Absolute characterisation of the radiation thermometer LP3 LNE completed Research
T 1035 2008-09-01 Adiabatic calorimeter in the 54K-273K temperature range LNE-LCM/CNAM completed Research
T 1576 2023-02-01 Air Temperature Calibration System (ATCS) BEV in progress Research
T 1459 2018-06-01 Air Temperature Metrology - ATM INRIM in progress Research
T 719 2003-05-01 Assessment of Traceability and CMC evaluation in Humidity METAS completed Research
T 1071 2008-04-01 Bilateral comparison Cu-fixed points by using Pt/Pd thermocouple VSL completed Comparison
T 746 2003-12-01 Bilateral comparison in dew-point temperature PTB completed Comparison
T 1143 2009-03-01 Bilateral comparison in fixed points of Ag and Cu using Pt/Pd thermocouple FSB-LPM completed Comparison
T 1145 2009-03-01 Bilateral comparison in fixed points of Argon FSB-LPM concluded Comparison
T 1144 2009-03-01 Bilateral comparison in fixed points of Zn, Sn, Ga and Hg FSB-LPM completed Comparison
T 1434 2017-01-02 Bilateral comparison of dew-point temperatures UME in progress Comparison
T 1114 2009-04-06 Bilateral comparison of freezing point of aluminium MIRS/UL-FE/LMK completed Comparison
T 1422 2017-06-15 Bilateral comparison of ITS-90 SPRT calibration from the Hg TP to the Zn FP JV completed Comparison EURAMET.T-K9.1
T 916 2006-09-01 Bilateral comparison of mercury triple point cells INTiBS completed Comparison
T 1335 2014-09-01 Bilateral comparison of radiation thermometers MIRS/UL-FE/LMK completed Comparison
T 1366 2015-03-16 Bilateral comparison of radiation thermometers MIRS/UL-FE/LMK completed Comparison
T 1394 2016-04-01 Bilateral comparison of radiation thermometers MIRS/UL-FE/LMK completed Comparison
T 1094 2008-03-01 Bilateral comparison of Relative Humidity Calibration BIM completed Comparison
T 1264 2013-02-28 Bilateral comparison of SPRT calibration at the ITS-90 fixed points of Ar, Hg, Ga, In, Zn and Al VSL completed Comparison EURAMET.T-K3.5
T 1137 2009-11-15 Bilateral comparison of the dew point temperature between TUBITAK UME and NIS UME completed Comparison
T 1583 2023-04-24 Bilateral comparison of the freezing point of zinc between BEV and SMU SMU in progress Comparison
T 1178 2010-09-01 Bilateral comparison of the realisations of the ITS-90 at the freezing points of Al (660,323 °C) and Ag (961,78 °C) SMD completed Comparison
T 1317 2014-04-01 Bilateral comparison of the realisations of the ITS-90 at the freezing points of Al (660,323 °C) and Ag (961,78 °C) LNE-LCM/CNAM concluded Comparison
T 1058 2008-04-03 Bilateral comparison of the realisations of the ITS-90 at the mercury point DTI completed Comparison
T 1095 2008-03-01 Bilateral comparison of the realizations of the ITS-90- at the fixed points of Hg, H2, Ga, In, Sn and Zn BIM completed Comparison EURAMET.T-K3.1
T 1127 2009-05-06 Bilateral comparison of triple point of mercury and melting point of gallium MIRS/UL-FE/LMK completed Comparison
T 1211 2011-10-01 Bilateral comparison of triple point of water cells VSL completed Comparison EURAMET.T-K7.3
T 895 2006-05-15 Bilateral comparison of water triple point cells INRIM completed Comparison
T 1429 2017-11-27 Bilateral comparison on triple point cells of mercury SMU completed Comparison
T 655 2002-01-01 Bilateral intercomparison of the calibration of type S thermocouples in the fixed points of Zn, Al, Ag and Au VSL completed Comparison
T 1338 2014-09-15 Bilateral international comparison of the standard platinum resistance thermometer (SPRT) in the temperature range from -40 °C to 230 °C UME completed Comparison
T 737 2002-11-01 Calibration facility for the low dew-point temperature range MIKES completed Consultation
T 1294 2013-11-01 Circulation of Pond Eng. Ar Triple Point System K-38 VSL in progress Research
T 869 2005-10-12 Co-operation in humidity between NMISA and MIKES MIKES completed Traceabillity
T 717 2004-01-01 Comparison in dew-point temperature (high range) PTB in progress Comparison EURAMET.T-K8
T 1061 2008-09-01 Comparison of Air Temperature Calibrations MIKES completed Comparison
T 927 2007-03-01 Comparison of blackbodies for calibration of infra-red ear thermometers MIRS/UL-FE/LMK completed Comparison
T 808 2004-09-01 Comparison of calibration facilities MIKES completed Consultation
T 625 2000-03-01 Comparison of fixed point cells (TP of Hg, MP of Ga, FP of Sn, FP of Zn, FP of Al, FP of Ag) and comparison of the W at the argon point MIRS/UL-FE/LMK completed Comparison
T 1457 2018-09-01 Comparison of measurement parameters required in radiance temperature scale realization from 156°C to 1100 °C INRIM in progress Comparison EURAMET.T-S7
T 1033 2008-11-01 Comparison of psychrometer calibrations - Pre-study FORCE completed Comparison
T 778 2004-12-01 Comparison of realisations of aluminum and silver freezing-point temperatures PTB completed Comparison
T 1149 2010-05-01 Comparison of surface temperature calibrations BFKH in progress Comparison
T 253 1991-10-21 Comparison of temperature scales DTI completed Comparison
T 1249 2012-03-19 Comparison of the calibration of liquid in glass thermometers in the range -30 °C to 150 °C MIRS/UL-FE/LMK completed Comparison
T 1392 2016-03-01 Comparison of the calibration of noble metal thermocouples up to 1100 ºC CEM completed Comparison EURAMET.T-S5
T 1251 2012-06-01 Comparison of the calibration of standard platinum resistance thermometers in the range -80 °C to 300 °C by comparison MIRS/UL-FE/LMK completed Comparison
167 result(s)