The list shows all projects coordinated within the Technical Committee for Thermometry.

Projects TC-T

Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
T 885 2006-03-01 New Determinations of the Boltzmann Constant PTB completed Research
T 895 2006-05-15 Bilateral comparison of water triple point cells INRIM completed Comparison
T 1178 2010-09-01 Bilateral comparison of the realisations of the ITS-90 at the freezing points of Al (660,323 °C) and Ag (961,78 °C) SMD completed Comparison
T 906 2006-03-01 Transferring knowledge on primary dew-point standards MIKES completed Consultation
T 912 2006-08-07 Developing primary dew-point standards MIKES completed Consultation
T 916 2006-09-01 Bilateral comparison of mercury triple point cells INTiBS completed Comparison
T 920 2006-11-01 Establishing scale realisation equivalence at high-temperature (2000 K) using a Pt-C eutectic point. LNE-LCM/CNAM completed Research
T 926 2006-11-01 High temperature fixed points for future temperature scale NPL completed Research
T 927 2007-03-01 Comparison of blackbodies for calibration of infra-red ear thermometers MIRS/UL-FE/LMK completed Comparison
T 930 2007-04-01 Traceability of sealed fixed point cells (ITS-90) BEV completed Traceabillity
T 1058 2008-04-03 Bilateral comparison of the realisations of the ITS-90 at the mercury point DTI completed Comparison
T 1059 2008-04-01 Proposal for RH CMC review protocol based on Euramet questionnaire MIRS/UL-FE/LMK completed Consultation
T 1061 2008-09-01 Comparison of Air Temperature Calibrations MIKES completed Comparison
T 1065 2008-07-01 Survey & strategic planning in the field of measurement of moisture in materials NPL completed Research
T 1071 2008-04-01 Bilateral comparison Cu-fixed points by using Pt/Pd thermocouple VSL completed Comparison
T 1094 2008-03-01 Bilateral comparison of Relative Humidity Calibration BIM completed Comparison
T 1382 2015-09-01 Comparison of the realisations of the dewpoint temperature in the range from -40 °C to 20 °C MIRS/UL-FE/LMK completed Comparison
T 1203 2011-09-28 Humidity training course MIRS/UL-FE/LMK completed Consultation
T 1459 2018-06-01 Air Temperature Metrology - ATM INRIM in progress Research
T 1114 2009-04-06 Bilateral comparison of freezing point of aluminium MIRS/UL-FE/LMK completed Comparison
T 1127 2009-05-06 Bilateral comparison of triple point of mercury and melting point of gallium MIRS/UL-FE/LMK completed Comparison
T 1128 2007-05-06 Traceability of SPRTs MIRS/UL-FE/LMK completed Traceabillity
T 1193 2011-05-01 Intercomparison of calibration of Au-Pt and Pt/Rh thermocouples at fixed points in the range from triple point of water up to copper fixed-point MIRS/UL-FE/LMK concluded Comparison
T 1137 2009-11-15 Bilateral comparison of the dew point temperature between TUBITAK UME and NIS UME completed Comparison
T 1143 2009-03-01 Bilateral comparison in fixed points of Ag and Cu using Pt/Pd thermocouple FSB-LPM completed Comparison
T 1144 2009-03-01 Bilateral comparison in fixed points of Zn, Sn, Ga and Hg FSB-LPM completed Comparison
T 1145 2009-03-01 Bilateral comparison in fixed points of Argon FSB-LPM in progress Comparison
T 1149 2010-05-01 Comparison of surface temperature calibrations BFKH in progress Comparison
T 1160 2010-06-30 Developing primary dew-point standards - dew-point generators GUM completed Consultation
T 1164 2010-10-11 Exercise Comparison of Platinum Resistance Thermometer UME completed Consultation
T 1189 2010-05-03 Comparison of the realisations of the relative humidity in the range from 10% to 95% at temperatures from -10 °C to 70 °C MIRS/UL-FE/LMK completed Comparison
T 1234 2012-11-01 Improving traceability in differential scanning calorimetry LNE concluded Comparison
T 1235 2012-11-01 Establishing and checking traceability for radiative properties of materials LNE completed Research
T 1236 2011-05-19 Comparison of the realisations of the ITS-90 over the range of 234.3156 K to 692.677 K MIRS/UL-FE/LMK completed Comparison
T 1241 2012-09-24 Training in temperature and humidity measurements INRIM completed Consultation
T 1249 2012-03-19 Comparison of the calibration of liquid in glass thermometers in the range -30 °C to 150 °C MIRS/UL-FE/LMK completed Comparison
T 1250 2012-10-01 Workshop Uncertainties in Radiometric Temperature Measurements at INRIM 12 October 2012 LNE-LCM/CNAM completed Consultation
T 1251 2012-06-01 Comparison of the calibration of standard platinum resistance thermometers in the range -80 °C to 300 °C by comparison MIRS/UL-FE/LMK completed Comparison
T 1259 2013-02-06 Developing a primary dew-point standard UME completed Consultation
T 1294 2013-11-01 Circulation of Pond Eng. Ar Triple Point System K-38 VSL in progress Research
T 1328 2014-07-14 Comparison of the dew-point temperature in range from -50 °C to +20 °C between GUM and CMI GUM completed Comparison
T 1317 2014-04-01 Bilateral comparison of the realisations of the ITS-90 at the freezing points of Al (660,323 °C) and Ag (961,78 °C) LNE-LCM/CNAM concluded Comparison
T 1446 2017-04-25 International Comparison of the High Temperature Standard Platinum Resistance Thermometer (HTSPRT) and the Thermocouples (Type S and Type S and Au/Pt) at the Silver Fixed Point 961,78 °C UME in progress Comparison
T 1332 2014-09-01 Interlaboratory comparison in the range from 420 °C to -40 °C DTI concluded Comparison
T 1335 2014-09-01 Bilateral comparison of radiation thermometers MIRS/UL-FE/LMK completed Comparison
T 1336 2014-09-08 Consultation on IR Metrology at NSAI NLM, Ireland NSAI NML completed Consultation
T 1338 2014-09-15 Bilateral international comparison of the standard platinum resistance thermometer (SPRT) in the temperature range from -40 °C to 230 °C UME completed Comparison
T 1352 2015-10-01 Comparison of the realisations of the relative humidity in the range from 10% to 95% at temperatures from -40 °C to 20 °C INTA in progress Comparison
T 1358 2015-04-01 Inter-national comparison of the calibration of thermocouple by comparison in the temperature range from 0 °C to 1100 °C UME in progress Comparison
T 1366 2015-03-16 Bilateral comparison of radiation thermometers MIRS/UL-FE/LMK completed Comparison
167 result(s)