The list shows all projects coordinated within the Technical Committee for Thermometry.

Projects TC-T

Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
T 1193 2011-05-01 Intercomparison of calibration of Au-Pt and Pt/Rh thermocouples at fixed points in the range from triple point of water up to copper fixed-point MIRS/UL-FE/LMK concluded Comparison
T 844 2005-06-01 Intercomparison of copper fixed-point cells by using Pt/Pd thermocouples PTB completed Research
T 426 1998-01-01 Intercomparison of heat flux sensors BFKH completed Comparison
T 511 1999-03-01 Intercomparison of humidity generators MIKES completed Comparison
T 290 1993-03-08 Intercomparison of humidity generators with dew-point hygrometer MIKES completed Comparison
T 280 1992-12-01 Intercomparison of Mercury point cells LNE-LCM/CNAM completed Research
T 624 2001-06-01 Intercomparison of Pt/Pd thermocouples calibrated at the freezing points of Cu (or Au) and Ag PTB completed Research
T 391 1996-11-15 Intercomparison of the freezing point of Indium JV completed Comparison EUROMET.T-S2
T 516 1999-01-01 Intercomparison of total hemispherical and normal spectral emissivity measurements LNE completed Comparison
T 278 1993-04-01 Intercomparison of water triple-point cell LNE-LCM/CNAM completed Comparison
T 1332 2014-09-01 Interlaboratory comparison in the range from 420 °C to -40 °C DTI concluded Comparison
T 1560 2022-05-01 Interlaboratory comparison of moisture measurements with biomass samples LNE-CETIAT in progress Comparison
T 809 2004-08-19 Interlaboratory comparison of PRT-calibration and evaluation of uncertainty budget Metrosert completed Consultation
T 714 2004-01-01 Interlaboratory comparison of the water triple-point cells LNE-LCM/CNAM completed Comparison
T 549 1999-11-01 Interlaboratory comparison on water triple point cells LNE-LCM/CNAM completed Comparison
T 1446 2017-04-25 International Comparison of the High Temperature Standard Platinum Resistance Thermometer (HTSPRT) and the Thermocouples (Type S and Type S and Au/Pt) at the Silver Fixed Point 961,78 °C UME in progress Comparison
T 715 2003-05-01 Investigation on frost point temperature scales and comparison of standards. INRIM completed Research
T 1147 2010-03-01 Key comparison EURAMET.T-K1: Realisations of the ITS-90, 2.4 K to 24.5561 K, using rhodium-iron resistance thermometers PTB completed Comparison EURAMET.T-K1
T 899 2006-06-01 Key comparison of water triple point cells (regional extension of CCT-K7) VSL completed Comparison EUROMET.T-K7
T 1082 2008-08-01 Key comparison of water triple point cells (regional extension of CCT-K7) SMU completed Comparison EURAMET.T-K7.1
T 621 2001-03-01 Key comparison(s) in humidity (dew-point temperature) MIKES completed Comparison EUROMET.T-K6
MC, T 1400 2016-04-27 Moisture metrology development NPL ongoing Research
T 279 1992-12-01 Multi-compartment cells for triple points in the cryogenic range LNE-LCM/CNAM completed Research
T 885 2006-03-01 New Determinations of the Boltzmann Constant PTB completed Research
T 550 1999-10-01 Novel High temperature Metal-carbon Eutectic fixed points for Radiation Thermometry, radiometry and thermocouples (HIMERT) NPL completed Research
T 1592 2023-08-25 Peer review of Czech Metrology Institute in the field of radiation temperature MIRS/UL-FE/LMK in progress Consultation
T 1059 2008-04-01 Proposal for RH CMC review protocol based on Euramet questionnaire MIRS/UL-FE/LMK completed Consultation
T 151 1994-01-01 Provision of traceability for absolute humidity NPL completed Traceabillity
T 237 1991-02-01 Radiometric measurement of the freezing points of silver and gold NPL completed Comparison
T 453 1998-02-01 Realisation of a radiometric temperature scale at UME in the middle temperature range INRIM completed Consultation
T 1442 2018-03-26 Relative humidity from 10 %rh to 95 %rh at temperatures from -10 °C to 50 °C FSB-LPM in progress Comparison
T 309 1994-03-01 ReproducIbility of the ITS-90 between 13,8 K and 303 K NPL completed Comparison
T 1447 2018-06-10 Round-Robin comparison of heat flux sensors BFKH in progress Comparison
T 1402 2016-03-22 Round-Robin comparisons of high temperature thermal conductivity measurement standards for insulation from 150 °C to 650 °C NPL concluded Comparison EURAMET.T-S6
T 705 2003-01-09 Setting up of temperature calibration facilities at MSA, Malta in the range -80 °C to 500 °C with calibration baths and fixed points MCCAA-SMI completed Consultation
T 240 1990-04-01 Sources of uncertainty of ITS-90 fixed points between -200 C/+400 C. LNE-LCM/CNAM completed Research
T 377 1997-07-01 Star Intercomparison of Low-Temperature Fixed Points using Sealed Triple-Point Cells PTB completed Comparison
T 1401 2016-03-22 Star-shape comparisons of high temperature thermal conductivity measurement standards for insulation from 150 °C up to 650 °C NPL concluded Comparison EURAMET.T-S6
T 1037 2007-06-01 Study of Argon triple point devices behaviour LNE-LCM/CNAM completed Research
T 1065 2008-07-01 Survey & strategic planning in the field of measurement of moisture in materials NPL completed Research
T 782 2004-10-01 The advancement of technical competence of staff in upcoming laboratories in humidity BFKH completed Consultation
T 658 2003-07-01 The examination of base parameters for ITS-90 scale realization in radiation thermometry NPL completed Research EUROMET.T-S1
T 409 1995-03-15 The realisation of the vapour pressure of Helium-3 and Helium-4 according to the ITS-90 VSL completed Research
T 181 1988-10-01 Thermal conductivity measurements of high temperature alloys NPL completed Comparison
T 864 2005-09-01 Thermodynamic temperature measurement of high-temperature blackbodies PTB completed Research
T 732 2003-06-01 Toward more accurate temperature fixed points LNE completed Research
T 711 2003-03-31 Traceability in humidity (dew-point temperature) INTA completed Traceabillity
T 411 1996-10-01 Traceability in infrared radiation thermometry from -50 °C to 800 °C (TRIRAT) VSL completed Traceabillity
T 1022 2007-11-01 Traceability of dew/frost point temperature INRIM completed Traceabillity
T 713 2003-05-01 Traceability of ITS-90 fixed points LNE-LCM/CNAM completed Traceabillity
167 result(s)