Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
MC 1271 2013-02-06 Electrolytic conductivity at pure water level RISE completed Comparison EURAMET.QM-S7
M 1566 2022-08-24 Bilateral key comparison in gas media (gauge mode) in the range 15 kPa to 175 kPa RISE in progress Comparison EURAMET.M.P-K8.2023
EM 1567 2022-03-07 Supplementary comparison - High voltage comparison of DC ratio RISE in progress Comparison EURAMET.EM-S46
EM 1568 2022-03-07 Supplementary comparison - High voltage comparison of high resistance RISE in progress Comparison EURAMET.EM-S47
TF 1156 2010-06-01 GPS link calibrations in support of CCTF-K001.UTC ROA ongoing Research
TF 529 1999-11-01 Comparison of the GPS time scale locally generated by NBS type receivers using a travelling standard ROA completed Research
TF 531 2006-04-16 Traceability of computer synchronised using Network Time Protocol to national timing centers ROA completed Research
TF 584 2000-03-01 Cooperation on Galileo programme by European time and frequency centres ROA completed Research
L 725 2003-03-12 Comparison of indexing tables, with small angle devider SMD completed Comparison
T 1178 2010-09-01 Bilateral comparison of the realisations of the ITS-90 at the freezing points of Al (660,323 °C) and Ag (961,78 °C) SMD completed Comparison
Q 1535 2021-10-01 On-site visits by peers of JRC-Geel in the fields of chemistry and ionising radiation SMD completed Consultation
M 402 1997-03-01 Mass mesurement (Guide to the mass determination) SMU concluded Research
EM 434 1997-07-01 Bilateral indirect comparison of 10 V Josephson array voltage standards SMU completed Comparison
EM 496 1998-10-01 Comparison of DC voltage standards SMU completed Comparison
EM 497 1998-10-01 Bilateral indirect comparison of 10 V DC voltage standards SMU completed Comparison
L 570 2000-02-01 Comparison of squareness measurements SMU completed Comparison
EM 796 2005-01-01 Traceability for reference standard of AC/DC voltage transfer SMU ongoing Traceabillity
L 905 2006-08-01 Bilateral comparison of squareness measurements SMU completed Comparison EUROMET.L-S18
L 910 2006-07-07 Bilateral comparison of squareness measurements SMU completed Comparison EUROMET.L-S19
T 1082 2008-08-01 Key comparison of water triple point cells (regional extension of CCT-K7) SMU completed Comparison EURAMET.T-K7.1
1218 result(s)