Please type a search term (at least two characters)
EURAMET Project Documents for Download
- EURAMET Guide No. 4: Guide on Comparisons
- Declaration of Coverage of CMCs by QMS (G-OPS-FRM-013)
- Eligibility Criteria for the Participation in EURAMET TC Projects
- EURAMET Guidelines for TC Projects
- Project Form: Registration of Agreed and Starting Projects
- Project Form: Progress and Final Report
- Project Form: Traceability Projects
- Project Form: Participation in EURAMET Comparisons
Subject | Reg. No. | Starting | TITLE | Coordinating Institute | Status | Collaboration Type | KCDB |
---|---|---|---|---|---|---|---|
PR | 37 | 1993-09-01 | Transfer standards for spectrophotometry and colorimetry | NPL | completed | Traceabillity | |
M | 213 | 1992-04-06 | Training periods in the pressure laboratory at L.N.E. | LNE | completed | Research | |
T | 1241 | 2012-09-24 | Training in temperature and humidity measurements | INRIM | completed | Consultation | |
L | 718 | 2003-05-19 | Training in laser frequencyy metrology | BEV | completed | Consultation | |
T | 249 | 1994-03-14 | Training courses on temperature standards. | NPL | completed | Research | |
T | 418 | 1997-04-01 | Training course on infrared thermometry | INRIM | completed | Research | |
L | 794 | 2004-08-30 | Training and practical issues in gauge block metrology | BEV | completed | Consultation | |
L | 871 | 2005-09-01 | Training and practical issues in angle metrology | INRIM | completed | Consultation | |
L | 306 | 1993-09-01 | Training | NPL | completed | Consultation | |
PR | 1106 | 2009-04-15 | Traceability of the spectral solar UV irradiance scale to SI units | PMOD/WRC | ongoing | Traceabillity | |
IR | 269 | 1992-07-01 | Traceability of the neutron reference fields in the energy range from 144 keV to 2.5 MeV | PTB | completed | Traceabillity | |
T | 653 | 2002-01-01 | Traceability of temperature | BEV | completed | Research | |
L | 588 | 2000-04-01 | Traceability of surveying and geadetic instruments | CEM | completed | Research | |
T | 1128 | 2007-05-06 | Traceability of SPRTs | MIRS/UL-FE/LMK | completed | Traceabillity | |
PR | 694 | 2002-08-01 | Traceability of spectral transmittance | Aalto | concluded | Traceabillity | |
PR | 892 | 2005-12-30 | Traceability of spectral power responsivity | RISE | ongoing | Traceabillity | |
PR | 603 | 2000-11-01 | Traceability of spectral irradiance scales using detector based standard lamps | BEV | concluded | Traceabillity | |
PR | 40 | 1991-12-01 | Traceability of spectral irradiance scales | NPL | completed | Traceabillity | |
T | 930 | 2007-04-01 | Traceability of sealed fixed point cells (ITS-90) | BEV | completed | Traceabillity | |
PR | 1067 | 2008-05-31 | Traceability of photometrical and radiometrical quantities between LNE-LCM/CNAM and DMDM | DMDM | ongoing | Traceabillity |
1204 result(s)