Please type a search term (at least two characters)
EURAMET Project Documents for Download
- EURAMET Guide No. 4: Guide on Comparisons
- Declaration of Coverage of CMCs by QMS (G-OPS-FRM-013)
- Eligibility Criteria for the Participation in EURAMET TC Projects
- EURAMET Guidelines for TC Projects
- Project Form: Registration of Agreed and Starting Projects
- Project Form: Progress and Final Report
- Project Form: Traceability Projects
- Project Form: Participation in EURAMET Comparisons
Subject | Reg. No. | Starting | TITLE | Coordinating Institute | Status | Collaboration Type | KCDB |
---|---|---|---|---|---|---|---|
IR | 31 | 1989-10-01 | Intercomparison of gas counting of Krypton-85 and tritium | NPL | completed | Comparison | |
EM | 47 | 1989-10-17 | AC voltage and current measurements | VSL | completed | Consultation | |
PR | 38 | 1989-11-01 | Fibre Optic standards | NPL | completed | Traceabillity | |
L | 135 | 1989-11-01 | Calibration service for line standards from 0 to 3000 mm | LNE | completed | Traceabillity | |
L | 137 | 1989-11-01 | Certification of API gauges | NPL | completed | Traceabillity | |
L | 7 | 1989-12-01 | Calibration of gear standards | PTB | completed | Traceabillity | |
M | 26 | 1989-12-01 | Hardness standards | INRIM | completed | Traceabillity | |
PR | 204 | 1990-01-01 | Measurement of diffusion of retroreflectors & ref. standards | INRIM | concluded | Traceabillity | |
AUV | 17 | 1990-01-01 | Pressure calibration of 0.5 inch microphones | METAS | completed | Comparison | |
M | 144 | 1990-01-01 | Measurement of air density using specially designed masses | PTB | completed | Research | |
TF | 179 | 1990-01-01 | Cs-beam frequency standard with magnetic state selection | METAS | completed | Research | |
F | 187 | 1990-01-01 | Development of miniaturized optical flowmeters | PTB | completed | Research | |
IR | 188 | 1990-01-01 | The provision of primary standards for air kerma & exposure | NPL | completed | Research | |
IR | 221 | 1990-02-01 | Absolute determination of neutron emission rate from radionuclide neutron sources | NPL | completed | Traceabillity | |
L | 207 | 1990-02-20 | Workshop on Optical Frequency/Wavelength Standards | PTB | completed | Consultation | |
IR | 219 | 1990-03-01 | Metrology of 192-Ir brachytherapy sources | JRC-Geel | completed | Comparison | |
L | 227 | 1990-03-23 | Workshop on co-ordinate measuring technology | NPL | completed | Research | |
T | 240 | 1990-04-01 | Sources of uncertainty of ITS-90 fixed points between -200 C/+400 C. | LNE-LCM/CNAM | completed | Research | |
EM | 224 | 1990-04-23 | Size corrections of quantized Hall resistance | PTB | completed | Comparison | |
M | 64 | 1990-05-01 | Automatic weighing | RISE | completed | Research |
1194 result(s)