Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
M 1375 2015-09-01 Bilateral comparison in high gauge pressure 250 MPa GUM in progress Comparison EURAMET.M.P-S16
T 1144 2009-03-01 Bilateral comparison in fixed points of Zn, Sn, Ga and Hg FSB-LPM completed Comparison
T 1145 2009-03-01 Bilateral comparison in fixed points of Argon FSB-LPM in progress Comparison
T 1143 2009-03-01 Bilateral comparison in fixed points of Ag and Cu using Pt/Pd thermocouple FSB-LPM completed Comparison
T 746 2003-12-01 Bilateral comparison in dew-point temperature PTB completed Comparison
L 1321 2014-06-23 Bilateral comparison in angle LNE completed Comparison EURAMET.L-K3.2009.1
T 1071 2008-04-01 Bilateral comparison Cu-fixed points by using Pt/Pd thermocouple VSL completed Comparison
EM 1363 2015-05-01 Bilateral comparison between EIM and IMBiH in resistance EIM completed Comparison
IR 1175 2011-03-01 Bilateral comparison (IRCL/GAEC-EIM and LNE-LNHB) of calibration of brachytherapy well type ionization chamber in terms of iridium 192 reference air kerma rate IRCL/GAEC-EIM completed Comparison EURAMET.RI(I)-S8
F 1587 2023-05-09 Bilateral comparison of volume using a 100 mL pycnometer VSL in progress Comparison
M 1070 2008-07-01 Bilateral and supplementary comparison with two SRG as transfer standard between SP and PTB RISE concluded Comparison
F 1247 2012-12-01 Bi-Lateral Intercomparison of Oil Flow Facilities Between NEL and FMC Technologies NEL completed Comparison
F 1334 2014-09-01 Bi-Lateral Intercomparison - Volume Calibration (20 litre) NSAI NML concluded Comparison
F 1369 2014-03-31 Bi-lateral comparison with TS of Key-Comparison CCM-FF.K2.2011 VSL completed Comparison
F 1415 2017-04-01 Bi-lateral comparison of standards for low-pressure gas flow VSL completed Comparison
F 1399 2016-04-18 Bi-lateral comparison of 500 ml flask FORCE completed Comparison
F 1384 2015-12-04 Bi-lateral comparion 1000 Liter proving tank with special design VSL completed Comparison
M 1210 2012-01-01 Best practice for the dissemination of the kilogram VSL completed Traceabillity
F 852 2005-07-01 Bell-, Piston-Prover Bilateral-Comparison METAS completed Comparison EUROMET.M.FF-S1
IR 605 2000-11-01 Beam Quality Specification of High-Energy Photon Beams METAS completed Research
1218 result(s)