Subject
Reg. No.
Starting
TITLE
Coordinating Institute
Status
Collaboration Type
KCDB
PR 37 1993-09-01 Transfer standards for spectrophotometry and colorimetry NPL completed Traceabillity
PR 38 1989-11-01 Fibre Optic standards NPL completed Traceabillity
PR 40 1991-12-01 Traceability of spectral irradiance scales NPL completed Traceabillity
PR 42 1990-10-01 Visual Scales for Photometry NPL completed Research
T 43 1988-10-31 Triple points of carbon dioxide and deuterium NPL completed Research
T 44 1988-09-01 High temperature platinum resistance thermometry NPL completed Research
M 45 1992-10-31 Intercomparison in the pressure range 50-500 MPa. LNE completed Comparison EUROMET.M.P-K5
EM 47 1989-10-17 AC voltage and current measurements VSL completed Consultation
F 50 1988-12-01 Calibration of vertical cylindrical tanks completed Comparison
EM 60 Fused silica capacitance standards INRIM completed Research
EM 61 1988-11-01 Josephson junction arrays for voltage standard application INRIM completed Research
M 64 1990-05-01 Automatic weighing RISE completed Research
IR 70 1990-06-01 Comparative measurements employing a U238 deposit NPL completed Comparison
EM 73 1992-02-03 High quality standards resistors NPL completed Research
EM 74 1988-06-01 Development of AC power standards for frequencies < 200kHz NPL completed Research
EM 75 1988-03-01 Measurement of capacitance and the SI ohm NPL completed Comparison
EM 77 1990-09-26 Optical time domain reflectometers (OTDR) NPL completed Comparison
EM 84 1988-07-01 Comparison of static wattmeters and watthourmeters BEV completed Comparison
TF 89 1988-09-01 International time comparison BEV completed Research
PR 90 1988-09-01 Intercomparison of absolute radiometer standards PTB completed Comparison
1245 result(s)