Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
PR 603 2000-11-01 Traceability of spectral irradiance scales using detector based standard lamps BEV concluded Traceabillity
PR 892 2005-12-30 Traceability of spectral power responsivity RISE ongoing Traceabillity
PR 694 2002-08-01 Traceability of spectral transmittance Aalto concluded Traceabillity
T 1128 2007-05-06 Traceability of SPRTs MIRS/UL-FE/LMK completed Traceabillity
L 588 2000-04-01 Traceability of surveying and geadetic instruments CEM completed Research
T 653 2002-01-01 Traceability of temperature BEV completed Research
PR 1611 2024-01-01 Traceability of the GAW-PFR reference Precision Filter Radiometers to the SI PMOD/WRC ongoing Traceabillity
IR 269 1992-07-01 Traceability of the neutron reference fields in the energy range from 144 keV to 2.5 MeV PTB completed Traceabillity
PR 1106 2009-04-15 Traceability of the spectral solar UV irradiance scale to SI units PMOD/WRC ongoing Traceabillity
L 306 1993-09-01 Training NPL completed Consultation
L 871 2005-09-01 Training and practical issues in angle metrology INRIM completed Consultation
L 794 2004-08-30 Training and practical issues in gauge block metrology BEV completed Consultation
T 418 1997-04-01 Training course on infrared thermometry INRIM completed Research
T 249 1994-03-14 Training courses on temperature standards. NPL completed Research
L 718 2003-05-19 Training in laser frequencyy metrology BEV completed Consultation
T 1241 2012-09-24 Training in temperature and humidity measurements INRIM completed Consultation
M 213 1992-04-06 Training periods in the pressure laboratory at L.N.E. LNE completed Research
PR 37 1993-09-01 Transfer standards for spectrophotometry and colorimetry NPL completed Traceabillity
M 1038 2006-08-16 Transferring knowledge on pressure balance calibration NSAI NML completed Consultation
T 906 2006-03-01 Transferring knowledge on primary dew-point standards MIKES completed Consultation
1218 result(s)