Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
EM 75 1988-03-01 Measurement of capacitance and the SI ohm NPL completed Comparison
EM 77 1990-09-26 Optical time domain reflectometers (OTDR) NPL completed Comparison
EM 84 1988-07-01 Comparison of static wattmeters and watthourmeters BEV completed Comparison
PR 90 1988-09-01 Intercomparison of absolute radiometer standards PTB completed Comparison
M 111 1992-02-18 Dynamic pressure measurement in liquid and gas LNE-ENSAM completed Research
M 113 1990-12-18 Multi-component force calibration systems and development of multi-component force transducer INRIM completed Research
T 119 1989-01-01 Gas and vapour-pressure thermometry between 1 and 25K INRIM completed Comparison
IR 124 1989-01-01 High energy photon fields at protection level PTB completed Traceabillity
IR 127 The NPL Fricke dosimetry service NPL completed Traceabillity
L 131 1991-01-01 Ion traps for new wavelength and frequency standards NPL completed Research
L 135 1989-11-01 Calibration service for line standards from 0 to 3000 mm LNE completed Traceabillity
L 137 1989-11-01 Certification of API gauges NPL completed Traceabillity
M 138 1991-01-01 Calibration of master hydrometers PTB completed Traceabillity
L 142 1988-10-01 Calibration of polarimeters and saccharimeters PTB completed Traceabillity
M 143 1988-05-01 Comparison of mass and measurement techniques at 10 and 50g NPL completed Comparison
M 144 1990-01-01 Measurement of air density using specially designed masses PTB completed Research
T 151 1994-01-01 Provision of traceability for absolute humidity NPL completed Traceabillity
M 152 1990-10-29 Calibration of pressure standards Ruska 2450-700 JV completed Traceabillity
TF 169 1988-07-01 Synchronization of time using telecommunication satellites INRIM completed Comparison
IR 176 1988-10-17 Development of Co-56 radionuclide standards NPL completed Research
1218 result(s)