Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
PR 42 1990-10-01 Visual Scales for Photometry NPL completed Research
T 43 1988-10-31 Triple points of carbon dioxide and deuterium NPL completed Research
M 45 1992-10-31 Intercomparison in the pressure range 50-500 MPa. LNE completed Comparison EUROMET.M.P-K5
EM 47 1989-10-17 AC voltage and current measurements VSL completed Consultation
EM 60 Fused silica capacitance standards INRIM completed Research
EM 61 1988-11-01 Josephson junction arrays for voltage standard application INRIM completed Research
M 64 1990-05-01 Automatic weighing RISE completed Research
IR 70 1990-06-01 Comparative measurements employing a U238 deposit NPL completed Comparison
EM 73 1992-02-03 High quality standards resistors NPL completed Research
EM 75 1988-03-01 Measurement of capacitance and the SI ohm NPL completed Comparison
EM 77 1990-09-26 Optical time domain reflectometers (OTDR) NPL completed Comparison
EM 84 1988-07-01 Comparison of static wattmeters and watthourmeters BEV completed Comparison
PR 90 1988-09-01 Intercomparison of absolute radiometer standards PTB completed Comparison
M 110 1992-02-18 Intercomparison in the pressure range 100 - 700 (1000) MPa LNE completed Comparison EUROMET.M.P-K6
M 111 1992-02-18 Dynamic pressure measurement in liquid and gas LNE-ENSAM completed Research
M 113 1990-12-18 Multi-component force calibration systems and development of multi-component force transducer INRIM completed Research
T 119 1989-01-01 Gas and vapour-pressure thermometry between 1 and 25K INRIM completed Comparison
IR 124 1989-01-01 High energy photon fields at protection level PTB completed Traceabillity
IR 127 The NPL Fricke dosimetry service NPL completed Traceabillity
L 131 1991-01-01 Ion traps for new wavelength and frequency standards NPL completed Research
1218 result(s)