Subject
Reg. No.
Starting
TITLE
Coordinating Institute
Status
Collaboration Type
KCDB
T 872 2005-10-15 Absolute characterisation of the radiation thermometer LP3 LNE completed Research
IR 221 1990-02-01 Absolute determination of neutron emission rate from radionuclide neutron sources NPL completed Traceabillity
L 873 2006-01-01 Absolute frequency measurements of stabilized lasers (MeP) in northern Europe for BIPM.L-K11 MIKES completed Comparison
EM 385 1996-11-01 AC Power measurement at 50 Hz PTB completed Comparison
EM 448 1998-10-20 AC Power Measurement at 50 Hz PTB completed Comparison
EM 536 1999-10-11 AC power measurement at 50 Hz BEV completed Comparison
EM 637 2002-04-01 AC power Measurement at 50 Hz in the presence of harmonics PTB concluded Comparison
EM 687 2002-12-01 AC Power Measurements at 50 Hz (follow up to project 385) UME completed Comparison EUROMET.EM-K5.1
EM 472 1998-09-01 AC properties of the Quantum Hall Resistance PTB completed Research
EM 540 2000-01-01 AC QHR sample holder METAS completed Research
EM 47 1989-10-17 AC voltage and current measurements VSL completed Consultation
EM 348 1995-09-01 AC/DC transfer devices at high frequencies VSL completed Comparison
EM 274 1994-01-01 AC/DC voltage transfer difference at highest accuracy level, expected uncertanty < 10-6 PTB completed Comparison
AUV 198 1989-03-01 Accelerometry PTB ongoing Traceabillity
IR 907 2007-01-01 Activity measurements and gamma emission intensities determination in the decay of 65Zn LNE-LNHB completed Comparison
T 1035 2008-09-01 Adiabatic calorimeter in the 54K-273K temperature range LNE-LCM/CNAM completed Research
IM 1001 2007-07-03 Agreement of traceability in measurement fields MIKES ongoing Traceabillity
T 1459 2018-06-01 Air Temperature Metrology - ATM INRIM in progress Research
IR 749 2004-01-01 Alpha-particle emission probabilities and energies in the decay of 240Pu JRC-Geel completed Research
AUV 482 1995-04-01 An assessment of medical ultrasonic field measurements NPL completed Research
1231 result(s)