The gateway to Europe's
integrated metrology community.

The list shows all projects coordinated within the Technical Committee for Flow.

TC Flow Projects

Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
F 1079 2008-09-01 Volumetric and gravimetric calibration of a 20 L proving tank INRIM completed Comparison
F 1008 2007-07-20 Volume Inter-comparison at 20 L - EURAMET Regional Key-comparison of CCM.FF-K4 IPQ completed Comparison EURAMET.M.FF-K4.b
F 1353 2015-02-06 Volume comparison on Calibration of micropipettes – Gravimetric and photometric methods IPQ completed Comparison
F 1395 2016-05-01 Volume comparison at 20 L - EURAMET Regional Key Comparison of CCM.FF-K4.1.2011 INRIM completed Comparison EURAMET.M.FF-K4.1.2016
F 1322 2014-10-01 Volume comparison at 100 microliter - Calibration of micropipettes IPQ completed Comparison EURAMET.M.FF-K4.2.2014
F 692 2002-09-01 Volume calibration of a 100 ml Gay-Lussac Pycnometer IPQ completed Comparison EUROMET.M.FF-K4
F 1159 2010-06-14 Volume calibration of a 100 microliter micropipette FORCE completed Comparison
F 865 2006-01-01 Volume calibration of 1000 µl micropipettes IPQ completed Comparison
F 1506 2020-09-01 Validation of standards for liquid flow rate under dynamic flows LNE-CETIAT completed Comparison
F 800 2004-09-01 The Harmonization of Reference Values for High-Pressure Natural Gas Volume VSL completed Research
F 799 2004-07-01 Technical characteristics and calibration capabilities of testing facilities for big water meters in Europe - Establishment of a data base BEV completed Research
F 1590 2023-12-23 Supplementary comparison: Intercomparison of calibration of a rotary piston gas meter G650 CMI in progress Comparison EURAMET.M.FF-S20
F 1617 2024-03-19 Supplementary comparison: Calibration of volumetric and piston operating instruments IPQ in progress Comparison
F 1526 2021-06-01 Supplementary comparison of gravimetric standards for hydrogen refuelling stations LNE-LADG in progress Comparison EURAMET.M.FF-S15
F 1553 2022-10-01 Supplementary comparison liquid volume – 500 mL and 5000 mL volumetric glass flasks VSL in progress Comparison EURAMET.M.FF-S19
F 1476 2019-09-01 Supplementary Comparison (SC) of Air flow low pressure Qmax 400 m3/h VSL completed Comparison EURAMET.M.FF-S12
F 1571 2022-12-01 Supplementary bilateral comparison for small gas flow rates (2 to 1000) SCCM at STP with Laminar Flow Elements METAS in progress Comparison EURAMET.M.FF-S18
F 307 1994-11-01 Sonic Nozzle intercomparison NEL completed Comparison
F 1483 2019-09-01 Revision of EURAMET Calibration Guide No. 21 - Guidelines on the Calibration of Standard Capacity Measures Using the Volumetric Method IPQ completed Consultation
F 1557 2022-05-22 Revision of EURAMET Calibration Guide No. 21 - Guidelines on the Calibration of Standard Capacity Measures Using the Volumetric Method INRIM completed Consultation
F 1423 2017-05-01 Revision of EURAMET Calibration Guide No. 19 - Guidelines on the Determination of Uncertainty in Gravimetric Volume Calibration IPQ completed Consultation
F 1604 2024-01-01 Revision of EURAMET Calibration Guide No. 19 'Guidelines on the Determination of Uncertainty in Gravimetric Volume Calibration' MIRS in progress Consultation
F 1473 2018-01-08 PTB-VTT MIKES DN100 comparison MIKES completed Comparison EURAMET.M.FF-S13
F 1508 2020-09-01 Pilot study: Intercomparison of ultra-low liquid flow rates in range below 100 nL/min NEL completed Comparison
F 1517 2021-01-04 Pilot study on high-pressure natural gas primary calibration facilities VSL completed Comparison
F 1613 2023-11-01 Pilot study for comparison of flow quantities on microfluidic transfer standards LNE-CETIAT in progress Comparison
F 547 2000-01-01 Measuring systems for milk - calibration with water and milk BEV completed Comparison
F 491 1998-12-01 Measurement standards for the density for liquids at elevated pressure NEL completed Comparison
F 827 2005-09-01 LDA-based intercomparison of anemometers PTB completed Comparison EUROMET.M.FF-S5
F, IM 1133 2009-06-22 Knowledge transfer in the field of liquid flow and volume metrology EIM completed Consultation
F 877 2006-01-01 Intercomparison on Water/Heat meters at 50 °C, 6-25 l/h RISE completed Comparison
F 1161 2010-09-06 Intercomparison on water/heat meter calibration at 50 °C, 6 - 25 L/h LNE-CETIAT completed Comparison
F 1162 2010-10-20 Intercomparison of Water Meter Reference Standard UME concluded Comparison
F 1233 2012-08-01 Intercomparison of water flow meter reference standard UME completed Comparison
F 1225 2013-01-31 Intercomparison of very low air speed standard facilities (0.05-1m/s) BEV/E+E completed Comparison EURAMET.M.FF-S9
F 669 2002-07-01 Intercomparison of two electromagnetic meters DN 25 BEV completed Comparison
F 470 1998-06-01 Intercomparison of the C* calculation NEL completed Comparison
F 573 2000-01-01 Intercomparison of small water flow facilities NEL completed Comparison
F 806 Intercomparison of low pressure gas flow facilities using a Molbloc transfer package NEL completed Comparison EUROMET.M.FF-S3
F 474 1998-09-01 Intercomparison of high pressure gas flow measurement facilities using turbine and Venturi meters NEL completed Comparison
F 407 1997-03-01 Intercomparison of calibrations of two G 400 turbine meters assembled in series completed Comparison
F 419 1997-09-01 Intercomparison of Calibrations of a G250 Rotary Gas Meter FORCE completed Comparison
F 831 2004-01-01 Intercomparison of calibration of master meters installed in a test rig, by two independent test methods (standard capacity tanks and Brooks piston prover) BEV completed Comparison
F 425 1997-09-01 Intercomparison of Bell Provers using a transfer meter NEL completed Comparison
F 388 1996-09-01 Intercomparison of anemometers METAS completed Comparison
F 514 1999-02-01 Intercomparison of anemometer test facilities using thermal anemometers and mechanical anemometers VSL completed Comparison EUROMET.M.FF-S4
F 1024 2008-05-01 Inter-laboratory comparison of primary low pressure gas flow standards from 25 l/min to 100 l/min MIKES completed Comparison
F 1006 2008-04-01 Inter-laboratory calibration comparison of the turbine gas meter in flow rates from 1000 m3/h to 10000 m3/h CMI completed Comparison
F 862 2006-03-27 Inter-laboratory calibration comparison of the turbine gas meter G650 CMI completed Comparison
F 1296 2014-03-17 Inter-laboratory calibration comparison of a rotary piston gas meter G650 CMI completed Comparison
127 result(s)