The list below shows all projects coordinated within the Technical Committee for Electricity and Magnetism.

TC EM Projects

Subject Reg. No. Starting TITLE Coordinating Institute Status Collaboration Type KCDB
EM 1217 2012-03-01 Comparison of High-Current Ratio Standard INRIM completed Comparison EURAMET.EM-S35
EM 759 2003-09-01 Comparison of high valued capacitor and inductor at power frequency. Aalto completed Comparison
EM 819 2005-02-01 Comparison of Electrical Field Strength Measurements above 1 GHz CMI completed Comparison EUROMET.EM.RF-S25
EM 520 1999-04-01 Comparison of Electrical field strength measurements METAS completed Comparison
EM 496 1998-10-01 Comparison of DC voltage standards SMU completed Comparison
EM 1324 2014-02-01 Comparison of DC voltage standard, Zener diode standard, at 1V, 1.018V and 10V LNE completed Comparison EURAMET.EM-S41
EM 1090 2008-12-15 Comparison of capacitance and capacitance ratio PTB completed Comparison EURAMET.EM-S31
EM 815 2004-11-01 Comparison of alternating voltage ratio INM-RO completed Comparison
EM 889 2006-02-01 Comparison of AC-DC Voltage Transfer Standards and 10 mH Inductance Standard PTB completed Comparison EUROMET.EM-K3
EM 464 1998-08-01 Comparison of ac voltage in the mV-range RISE completed Comparison EUROMET.EM-K11
EM 427 1998-01-05 Comparison of AC and DC conductivity standards NPL completed Comparison EUROMET.EM-S7
EM 1319 2014-04-10 Comparison of a 100 ohms resistance standard LNE completed Comparison
EM 272 1996-08-01 Comparison of 100 Ohm resistors NPL completed Comparison
EM 429 1998-01-01 Comparison of 10 V DC reference standards. VSL completed Comparison EUROMET.EM.BIPM-K11
EM 1381 2016-11-01 Comparison for Ultra-low DC Current Sources UME completed Comparison EURAMET.EM-S44
EM 1478 2019-09-02 Comparison Calibration of RF Current Monitoring Probe UME completed Comparison EURAMET.EM-S45
EM 1129 2008-12-01 Characterisation of RF diode power sensors METAS completed Comparison
EM 466 1998-04-01 Characterisation of ac-dc transfer thermal converters with an FRDC source METAS completed Research
EM 1409 2016-11-14 Calibration strategies of a dual-stage transimpedance amplifier (ULCA) with 1 GΩ nominal overall transresistance PTB completed Research
EM 755 2003-03-03 Calibration service for RF noise standards PTB concluded Traceabillity
179 result(s)