The list below shows all projects coordinated within the Technical Committee for Electricity and Magnetism.

TC EM Projects

Subject
Reg. No.
Starting
TITLE
Coordinating Institute
Status
Collaboration Type
KCDB
EM 472 1998-09-01 AC properties of the Quantum Hall Resistance PTB completed Research
EM 540 2000-01-01 AC QHR sample holder METAS completed Research
EM 554 2000-02-01 Traceability of Josephson standards BEV completed Research
EM 559 1999-11-01 Construction of high resistance measurement standards up to 1 Gohm MIRS/SIQ/Metrology completed Research
EM 613 2000-03-23 RF Impedance Standards and Traceability for Four-Terminal Pair and Related Measurements at frequencies form 1MHz to above 30 MHz NPL completed Research
EM 626 2001-05-01 Analysis of different measurement set-ups for a programmable Josephson voltage standard PTB completed Research
EM 631 2001-10-01 Electrical nanometrology VSL completed Research
EM 645 2001-12-01 QHE resistanhce standard with DVM and JAVS readout VSL completed Research
EM 646 2002-01-01 Guidelines for the evaluation of uncertainty budgets for JAVS and QHE based calibrations METAS completed Research
EM 648 2002-03-01 The Challenge of New Technologies in Electrical Metrology at RF, Microwave and Higher Frequencies NPL completed Research
EM 681 Bilateral Comparison on Power Measurements Between UME and PTB UME completed Research
EM 700 2003-01-01 Gold plated copper lugs for precision dC voltage measurements METAS completed Research
EM 756 2003-12-02 Synthesis of arbitrary waveforms using the Josephson effect NPL completed Research
EM 817 2004-10-01 Metrological applications of single-electron transport NPL completed Research
EM 840 2005-01-15 Reference standards for ac-dc voltage and current transfer RISE completed Research
EM 848 2005-06-01 Binary Josephson Array Power Standard PTB completed Research
EM 856 2005-07-01 Study and validation of Quantum Hall Array Resistance Standards (QHARS) LNE completed Research
EM 1168 2010-10-01 Using Agilent 3458 Multimeter for precision sampling in calibration latoratory MIRS concluded Research
EM 1174 2011-01-17 Study of capacitance loss factor standards at 10 kV level MIKES completed Research
EM 1409 2016-11-14 Calibration strategies of a dual-stage transimpedance amplifier (ULCA) with 1 GΩ nominal overall transresistance PTB completed Research
175 result(s)