Publications

Please find below selected publications from EURAMET's European Metrology Research Projects (EMRP and EMPIR) that are related to Mathmet:

Four-Terminal Pair Digital Sampling Impedance Bridge up to 1MHz
Maslan, S., Šíra, M., Skalicka, T. und Bergsten, T.
2019

IEEE Transactions on Instrumentation and Measurement 68 (2019) , 1860 - 1869

Type: 
Article
Project title: 
15RPT04: TracePQM: Traceability routes for electrical power quality measurements
Name of Call / Funding Programme: 
EMPIR 2015: Research Potential
Characterization of an analog-to-digital converter frequency response by a Josephson arbitrary waveform synthesizer
Diaz de Aguilar, J., Salinas, J.R. (Dpto. Tecnologia Electrónica ETSI telecomunicación, Universidad de Málaga), Kieler, O., Caballero, R., Behr, R., Sanmamed, Y.A. und Méndez, A. (Dpto. Mecánica de fluidos y propulsión aerospacial ETSIA, UPM.)
2019

Measurement Science and Technology 30 (2019) , 035006

Type: 
Article
Project title: 
15RPT04: TracePQM: Traceability routes for electrical power quality measurements
Name of Call / Funding Programme: 
EMPIR 2015: Research Potential
Bayesian analysis of a flow meter calibration problem
Kok, G. J. P. (VSL), Van der Veen, A. M. H. (VSL), Harris, P. M. (NPL), Smith, I. M. (NPL) und Elster, C. (PTB)
2015

Metrologia 52 (2015) , 392-399

Type: 
Article
Project title: 
NEW04: Uncertainty: Novel mathematical and statistical approaches to uncertainty evaluation
Name of Call / Funding Programme: 
EMRP A169: Call 2011 Metrology for New Technologies
Man as a Measurement Instrument
Pendrill, L R (SP)
2014

NCSLI Measure J. Meas. Sci. 9 (2014) , 24-35

Type: 
Article
Project title: 
NEW04: Uncertainty: Novel mathematical and statistical approaches to uncertainty evaluation
Name of Call / Funding Programme: 
EMRP A169: Call 2011 Metrology for New Technologies
On the adjustment of inconsistent data using the Birge ratio
Bodnar, Olha und Elster, Clemens
2014

Metrologia 51 (2014) , 516-521

Type: 
Article
Project title: 
NEW04: Uncertainty: Novel mathematical and statistical approaches to uncertainty evaluation
Name of Call / Funding Programme: 
EMRP A169: Call 2011 Metrology for New Technologies
A surrogate model enables a Bayesian approach to the inverse problem of scatterometry
Heidenreich, S (PTB), Gross, H (PTB), Henn, M-A (PTB), Elster, C (PTB) und Bär, M (PTB)
2014

Journal of Physics: Conference Series 490 (2014) , 012007

Type: 
Article
Project title: 
NEW04: Uncertainty: Novel mathematical and statistical approaches to uncertainty evaluation
Name of Call / Funding Programme: 
EMRP A169: Call 2011 Metrology for New Technologies
Interval estimations in metrology
Mana, G. und Palmisano, C.
2014

Metrologia 51 (2014)

Type: 
Article
Project title: 
NEW04: Uncertainty: Novel mathematical and statistical approaches to uncertainty evaluation
Name of Call / Funding Programme: 
EMRP A169: Call 2011 Metrology for New Technologies
Simplified evaluation of magnetic field fluctuation thermometry
Wübbeler, G und Elster, C
2013

Measurement Science and Technology 41 (2013)

Type: 
Article
Project title: 
NEW04: Uncertainty: Novel mathematical and statistical approaches to uncertainty evaluation
Name of Call / Funding Programme: 
EMRP A169: Call 2011 Metrology for New Technologies
8 RESULT(S)